Cherry Floor: Phase Two

For reference, this is how my floor started. (I thought I’d posted these photos, but I guess I not.) This is the day Keith came and picked up the logs to take to the sawmill. Phase One:

The pile of logs
The pile of logs
Keith taking the logs away
Keith taking the logs away

For phase two, Keith milled the logs into lumber and dried them in the kiln. Saturday we went to pick up the lumber and transported it to the Hicksville Planing Mill where they’ll make the lumber into floorboards.

We arrive at the sawmill.
We arrive at the sawmill.
Sawmill
Sawmill
Keith opening the kiln.
Keith opening the kiln to reveal my lumber.
My floor in the kiln: Keith told us about the very complicated sequence of temperatures and time that it takes to each species of tree dried just right.
He told us about the very complicated sequence of temperatures and time that it takes to get each species of tree dried just right.
Trailer's all loaded up. Hmm.. that might be a bit too tall and wobbly.
Trailer's all loaded up. Hmm.. that might be a bit too tall and wobbly.
That's better. We'll pick up the other bundle plus the Walnut this week.
That's better. We'll pick up the other bundle plus the Walnut this week.
Cherry Floor: Phase Two
Cherry Floor: Phase Two
We arrive at Hicksville.
We arrive at Hicksville.
Planing Mill
Planing Mill
Saturday's a busy day at Hicksville!
Saturday's a busy day at Hicksville!
Bye Phase Two! See you at Phase Three!
Bye, Phase Two! See you at Phase Three!
Is that a bike?! I hate bikes!!
"Is that a bike?! I hate bikes!!"
....
....
"Get outta here!! I hate you, bike!!"
"Get outta here!! I hate you, bike!!"

1 thought on “Cherry Floor: Phase Two”